When is Your Building Going to Be Delivered? 4/5

September 4th, 2007

Some customers choose to have their new building trucked in to the place of construction before the beginning of the erection process. In order to protect all the pre-engineered pieces from dust contamination, the customer should check and double-check to see that adequate covering is in place over the pre-engineered framing pieces. Primer and protective coatings are already on the pre-engineered parts when they arrive at the job site. This protective coating does not make the steel framing pieces 100% impervious to the weather, however, even if the building parts will be sitting at the construction site for only a short period of time.  >>>to be concluded